With help from friends and family I made a list of 6 items to tackle. For the first time ever we completed both the 1st and 2nd most important items.

Added the upper sheets of drywall to the walls and began the taping & mudding.

Removed the old sink drain and vent and installed a new drain line in the sinks new location. The 3″ pipe is prep work for the new first floor powder room.

Removed two branch ducts that were in the way. All of the ducts will eventually be removed but for now this is all we can do.

Finished the supply lines to the 2nd floor bath. A new vanity is coming that will hide and protect the pex pipe.

I’m very happy that 4 of the 6 items were completed. I wonder if the bigger list gave us all more motivation to get things done?